At Novelo, we don’t just build beautiful custom homes β€” we guarantee completion within 10 months, or we pay you.

While delays are common in the industry, our integrated process ensures your project stays on track from day one. We combine fast-tracked construction with a phased interior design approach, in-house manufacturing, and a highly coordinated trade team β€” so you get a luxury finish without delay.

πŸ’‘ Why Time Matters in Custom Home Builds

Every month of delay adds cost, stress, and lost opportunity. Our clients β€” whether homeowners or developers β€” want certainty, not surprises.

That’s why we created a system that allows us to build and design in parallel, moving faster while maintaining full control over quality and detail.

πŸ”§ How We Deliver Your Custom Home in 10 Months

βœ… Stage 1: Planning, Approvals & Site Kickoff (Weeks 1–4)

We start the project with:

  • Finalised structural drawings and approvals in place
  • Demolition and site preparation
  • Interior design kickoff, beginning with plumbing zones (kitchens, bathrooms, laundry)

This allows us to start construction without delay while progressing interior design in stages.

βœ… Stage 2: Slab & Plumbing Coordination (Weeks 5–6)

  • Plumbing points confirmed based on early interior planning
  • Slab preparation and pour begins immediately
  • If excavation is required, we continue design work for other floors in parallel

Our construction and design teams work in tandem to keep every detail aligned with site progress.

βœ… Stage 3: Framing & Structural Build (Weeks 7–13)

  • Full structural frame and roof structure completed
  • External windows and doors installed early via our direct supply line
  • Interior design is finalised for major areas: kitchen, living spaces, media rooms, and most bedroom zones

By reaching the roof early, we create the flexibility to focus on the finer details in later stages.

βœ… Stage 4: Lock-Up & Rough-In (Weeks 14–17)

  • Full external envelope completed (brick/rendering, waterproofing)
  • Electrical, plumbing, and mechanical rough-ins
  • Remaining interior design details and finishing touches in bedrooms, feature areas, and storage spaces

Selections are finalised just in time for install β€” no rush, no delay, and no decision fatigue months in advance.

βœ… Stage 5: Interior Fit-Out (Weeks 18–32)

This is where your vision truly comes to life.

  • Internal walls and ceilings
  • Flooring, tiling, feature finishes
  • Bespoke kitchens, vanities, wardrobes, and custom joinery

Thanks to our own cabinetry and window factory, we eliminate third-party delays and control every aspect of the quality and timing. Materials are manufactured to spec and installed precisely on schedule.

We’ve also built a strong on-site trade culture, where every contractor works as one coordinated team β€” ensuring smooth transitions, faster progress, and luxury-level detail.

We don’t just build faster β€” we build smarter, and better.

βœ… Stage 6: Final Touches & Handover (Weeks 33–40)

  • Final fittings, appliances, and detailing
  • Quality control inspections and occupancy certificates
  • Handover walkthrough and completion

You receive your keys on time β€” without the frustration, stress, or extended delays most custom builds suffer.

πŸ”’ Our Guarantee

If we don’t deliver your custom home within 10 months, we’ll pay you $1,000 for every day delayed, up to a capped agreed amount outlined in your contract.It’s in writing. It’s enforceable.
And it reflects our confidence in our people, process, and delivery.

Build with Confidence. Build with Novelo.

πŸ“ Visit our Lane Cove showroom to view our materials and finishes
πŸ“ž Contact our Bella Vista head office to book your consultation today

Terms and Conditions Apply

Guarantee applies to custom homes up to 800 sqm.
Excludes delays caused by:
β€’ Client-initiated changes after contract signing
β€’ Extreme weather events
β€’ Authority or service provider delays outside our control such as council and certification of occupancy.